北京辽宁企业商会
Beijing Liaoning Enterprise Chamber of Commerce

海外矿产冶金领域的合作项目

 


№ п/п

Project title

项目名称

Note

备注

1

Construction of copper smelter plant with capacity of 300,000 tons of copper cathode

建产能为30万吨阴极铜的炼铜厂

Investor is required Required.

需投资方

2

Construction of a metallurgical plant on the basis Masalsky iron ore deposit in Akmola region

在阿克莫拉州以马萨里(音译)铁矿产地为基础建钢铁厂

Probable reserves - 1 billion tons of ore.

Required funding for the project or partner for joint implementation on  possible scheme: 80% of the loan, the investor 20%

预测储量为10亿吨铁矿石。

项目需融资或合作伙伴,可按如下模式合作实施:贷款80%,投资方20%

3

Modernization of JSC "ArcelorMittal Temirtau" with production of high-quality steel grades in Temirtau, Karaganda region

股份公司现代化改造 -- 生产高标号钢材

铁米尔套市,卡拉干达州

Increase of capacity to 6 million tons per year.


Borrowed funds are required

扩产至600万吨每年,需贷款

4

Industrial development of Shalkiya polymetallic deposits in Kyzylorda region with the construction of the metallurgical complex

对克孜勒奥尔达州沙尔基雅(音译)多金属矿石产地进行工业开发并建冶金厂

There is a project feasibility study and  design and  estimate documentation. The deposit is ranked 7th in the world  with 6.5 million tons of zinc reserves and  1.7 million tons of lead reserves

项目有可研和设计预算资料。按锌(650万吨)和铅(170万吨)的储量,该矿产地居世界第七位。

5

Construction of a metallurgical plant for processing of cobalt-nickel ore of the  "Gornostayevskoye" field in

East Kazakhstan region

在东哈萨克斯坦州建冶金厂加工“戈尔诺斯塔耶夫斯科耶(音译)”矿产地的钴-镍矿石

Reserves compromise 32 million tons of ore containing 244,000 tons of nickel and 16,000 tons of cobalt.

Production capacity - 1.9 million tons of ore per year.
Project funding is required. Company proposes to carry out the project to Appendix 1.

储量为3200万吨矿石,含镍24.4万吨,钴1.6万吨。                                                                                            产能为每年190万吨。                                                                                                                     项目需融资。该公司建议将此项目移至附件一。

6

Syrymbet production of tin

斯雷姆别特(音译),生产锡

Joint Ore Reserves Committee report, Metallurgical report from SGC Canada

联合委员会已出矿石储量报告,加拿大SGS公司已出冶炼报告。

7

Development of Benkala and South Benkala copper deposits  in Aktobe region

开发阿克纠宾州本卡拉(音译)和南本卡拉铜矿

Funding scheme: Capital Investments (preferably).We are prepared to consider convertible or long-term loans. Project documentation: Project documentation in accordance with   requirements of the Republic of Kazakhstan, Project of SX-EW plant is developed by Calder Engineering (Australia) and adapted to the standards of Batys Engineering of the Republic of Kazakhstan. Geological reports under JORC standards prepared by Wardell Armstrong International.

融资模式:资本投资(最优选择)。可以考虑浮动的或长期的贷款。项目资料:符合哈萨克斯坦要求的设计文件,SX-EW工厂设计由澳大利亚Caldera Engineering完成并转而符合哈萨克斯坦“巴迪斯(音译)工程”的标准,Wardell Armstrong International完成JORC标准的地质报告。

8

Mining complex in Kargaly Aktobe region

在阿克纠宾州卡尔加雷(音译)建选矿厂

Production is carried out since 2008. Inventories - up to 1 billion tons of ore possibility of production of titanium and vanadium.
Investor and  loan funds are required

2008年清算后开始生产产品,最高可产10亿吨矿石,可产钛和钒等。

需投资方或贷款。

9

Production of longitudinal welded pipes

生产直缝管

The project for the production of longitudinally welded pipes with diameter of 20-219 mm for gasification. Feasibility study is not ready.

直缝管生产项目,直径20-219mm用于气化。可研未完成。

10

A line for production of electrolytic aluminum with capacity of 250,000 tons per year, Pavlodar region

年产25万吨电解铝生产线,巴甫洛达尔州

Project is included in Appendix 1

该项目已列入附件一

11

Production line with  capacity of 3 million tons of steel per year

年产300万吨钢的生产线


12

Transfer metallurgical plant,

South Kazakhstan region

钢厂转移,南哈萨克斯坦州

Establishment of mining and processing complex, construction of direct-reduced iron (facility) as per innovative technology of casting-rolling plant. Implementation Period: 2015 - 2017. Obtaining a license is required for development of Abail iron ore deposit. Anhui company is prepared to consider the possibility of transferring one of its plants with capacity of about 1.5 million. Tons in Kazakhstan (plant was closed due to urban plan change in its current location). Business plan and feasibility study on the development stage. Plot of land has been allocated in the industrial zone of South Kazakhstan region

建设选矿综合体,建设按创新技术直接复原铁的装置和铸轧厂。实施时间:2015-2017年。需办理阿巴伊(音译)铁矿的采矿权。安徽公司愿考虑将自己产能约为150万吨的一个厂转移至哈萨克斯坦(该厂因城市建设规划改变而被原址关停)。商务计划和可研正在制订阶段。在南哈州产业园内已划拨了土地。

13

Construction of  steelmaking plant, South Kazakhstan region

建铸钢厂,南哈州

Business plan and feasibility study on the development stage. Plot of land has been allocated in the industrial zone of South Kazakhstan region

商务计划和可研正在制订阶段。在南哈州产业园内已划拨了土地。

14

Organization of production of steel pipes, North Kazakhstan region

组织直缝钢管的生产,北哈州

Design; construction of communications; constructions of administrative building, construction of storage facilities; construction of a workshop for  production; construction of access railways; production; sales. Implementation period: 3 years. Markets for products / services: Kazakhstan, Siberia, Altai and East regions of Russia,  Republics of Central Asia.

设计;通信建设;行政楼建设,仓库建设;生产车间建设;铁路支线建设;生产;销售。实施时间:3年。产品/服务的销售市场:哈萨克斯坦,俄罗斯的西伯利亚、阿尔泰和东部地区,中亚各国。

15

Production of barite concentrate on the Ansay field in Kentau, South Kazakhstan region

在南哈州肯套市安塞(音译)矿产地生产精重晶石(硫酸钡)

Business plan and feasibility study on the development stage. Plot of land has been allocated in the industrial zone of South Kazakhstan region. Required investment - 80%

商务计划和可研正在制订阶段。在南哈州产业园内已划拨了土地。需投资:80%

16

Production of steel billets, 530,000 tons per year

生产钢锭,年产53万吨

1. Land is determined with infrastructure supply
2. The largest consumer in the face of rail and structural steel plant

1.土地已确定,可奠定基础设施;

2. 以钢轨钢梁厂为代表的大用户。

17

Organization of production for anti-corrosion protective coatings on steel structures and other metal products by hot-dip galvanizing in Atyrau region

组织关于用热镀锌方法为钢结构和其他金属制品上防腐层的生产,阿特劳州

Model funding due to distribution of investment shares between parties still have not been recorded. Availability and content of Chinese participation in project: Wuchuang company is comitted to supply equipment, installation, commissioning, staff training and technology transfer hot-dip galvanizing.

融资模式:各方投资份额分配尚未明确。项目有并包括中方的参与:Wuchuang负责供应设备、安装、调试、培训人员和转让热镀锌技术。

18

Establishment of mining,chemical and metallurgical complex on the basis of "Tymlay" titanomagnetite deposit in Zhambyl region

在江布尔州以“德姆来(音译)”钛磁铁矿产地为基础建立矿产化工冶金综合体

Completion on the development of feasibility study. Participation initiator 120 mln.USD, innovative technologies, subsoil usage rights. Production technology is developed, first products have been received which exceed the performance characteristics of GOST.

可研正在完成。倡议方出资1.2亿美元,创新技术,采矿权。制订了生产工艺,得到了第一批产品,指标超过了国家标准。